CEVA Logistics

10 December 2020

87f04456-b78d-459f-bc5e-a3538b980cfc

CEVA Logistics were looking to optimise the packing operation for a large contract with Coopers of Stortford, in preparation for an increase in demand during the company’s peak period. After visiting the site, Allpack engineers provided an in-depth consultation, identifying means to improve their process flow by retrofitting innovative mailing bag containers, item inserts and waste bins into the 20-bench pack station setup.

packing_bench_final_draft                                                             Final concept drawing for retrofit pack bench design

Having set about increasing the operation’s productivity to handle an upsurge in throughput, Allpack put forth a range of design proposals to ensure a tidier, more efficient pack station for operatives, allowing for increased productivity to meet the imminent increase in demand.

Following successful installation of the retrofit pack bench solutions, the general manager at the CEVA Logistics Max Park site agreed the design changes would well equip the company for the peak period, allowing an increase in throughput of up to 20% without the need for additional staff or pack stations.

More Articles